Menu Close

The Westin – Hydronic Heating

Back to Portfolio

 

2000 to 2020

hydronic repairs

We have completed many services and projects at the Westin to date, but here is a list of the most notable projects.  

 

2017 Installed variable frequency drives (VFDs) for the 2 main system pumps. This improved energy efficiency and maximized heating output.
2015 Re-piped 12 heating & DHW boilers to primary / secondary piping strategy. At this same time, we upgraded the heating controls. This dramatically improved heat transfer and efficiency by 30% within 6 months.  Within 1 years time, the energy costs went from the high “black” margin down to proper operating margins.
2013 10 years after our last mechanical inspection, we were called in again to assess the current condition of 14 heating and DHW boilers. They were in very poor condition, and every boiler failed safety and operational inspections. We completed all the required repairs and got those 14 boilers working properly and safely.
2009-2018 Completed backflow testing and repairs on all the devices.
2003 Completed full mechanical inspection and operational procedure manuals on entire heating & domestic hot water systems.
2000 Replaced pneumatic compressors and air driers.

 

Our General Service Area:
Edmonton, Sherwood Park & St Albert

Request a quote outside these areas

 

Request A Quote

Please fill out the form below to request a quote and we will respond within 24 hours. If you have any questions, please contact us at 780-474-7481.