2000 to 2020
We have completed many services and projects at the Westin to date, but here is a list of the most notable projects.
2017 | Installed variable frequency drives (VFDs) for the 2 main system pumps. This improved energy efficiency and maximized heating output. |
2015 | Re-piped 12 heating & DHW boilers to primary / secondary piping strategy. At this same time, we upgraded the heating controls. This dramatically improved heat transfer and efficiency by 30% within 6 months. Within 1 years time, the energy costs went from the high “black” margin down to proper operating margins. |
2013 | 10 years after our last mechanical inspection, we were called in again to assess the current condition of 14 heating and DHW boilers. They were in very poor condition, and every boiler failed safety and operational inspections. We completed all the required repairs and got those 14 boilers working properly and safely. |
2009-2018 | Completed backflow testing and repairs on all the devices. |
2003 | Completed full mechanical inspection and operational procedure manuals on entire heating & domestic hot water systems. |
2000 | Replaced pneumatic compressors and air driers. |